It is during our darkest moments that we must focus to see the light

Mwen se echantiyon yon ras kap boujonnen men ki poko donnen

Si vous voulez vous faire des ennemis essayer de changer les choses

Showing posts with label USAID Haiti. Show all posts
Showing posts with label USAID Haiti. Show all posts

Wednesday, October 10, 2012

Reframing Haiti’s National Security Policy By Stanley Lucas



Historic Context
Since the founding of the Republic of Haiti in 1804, our country has had a proud tradition of a professional defense force capable of securing our national borders and defending our sovereignty.  In 1959, that changed when the Duvalier regime corrupted and politicized the army turning it into a destabilizing force, predatory upon our people.  Jean Bertrand Aristide tried the same in the 1990’s; however, he failed and requested foreign military occupation of the country and dissolved the army. 

It was as a result of the actions of the Duvalier and Aristide dictatorship that our army descended into 40 years of chaos and corruption turning against its own people.  In 1994, for myriad complex political justifications, former President Aristide chose to disband our army rather than reform and professionalize our military service.  Haiti fared no better with the absence of a military force.  In its absence, politically organized gangs have threatened the citizens, drug trafficking has burgeoned and our borders have been breached without recourse.  Without a military, our country was unable to operate in the wake of the tragic January 12, 2010 earthquake and was forced to rely upon the U.S. military to stabilize our country.

We now have an opportunity to reframe our national security policy and ensure that we never return to that state of affairs.  We must ensure that we honor the founders of our Republic, Jean Jacques Dessalines and Toussaint Louverture, who both used the army to secure freedom and liberty for our people and champion those values worldwide.  In fact, Haitian soldiers fought alongside the Bolivars to secure freedom throughout Latin America; and they fought alongside American soldiers in Savannah, Georgia to overthrow colonial rule.  Haiti has made an indelible historic contribution to the cause of freedom and liberty.  

Under the Martelly Administration, Haiti can reclaim its national sovereignty and restore a professional, modernized Territorial Defense Force.  Haiti's defense policy can be strategic and comprehensive focused on protecting and preserving our national interests.  We can strengthen our existing defense institutions and leave behind a legacy of a functioning defense apparatus for the next Administration breaking the cycle of failed leadership.  

Principle-Based Policy

First, we need to ground our defense policy in a core set of universally accepted principles:  
  • Safeguard the National Interests and Sovereignty of Haiti.  Haiti can reclaim its ability to defend its borders from external threats.  As such, Haiti should establish a Territorial Defense Force in the interest of defending the borders and supporting our nation in times of disaster.  The United Nations force, known as MINUSTAH, is currently supposed to be providing this function but has not met expectations.  Further, MINUSTAH is technically an occupation of our country and a violation of our national sovereignty.  We should work with the United Nations to redefine our Framework of Cooperation to drawdown their forces in a timely manner and encourage those resources to be channeled into a new Haitian-led Territorial Defense Force.

  • Promotion and Defense of Freedom and Human Dignity Worldwide.  Haiti was founded upon the principles of freedom and human dignity when in 1804 our forefathers overthrew a colonial power to achieve freedom from slavery making Haiti the world’s first black republic.  In keeping with our proud history, we must champion, support and defend freedom and liberty worldwide.  This principle should serve as the foundation upon which all policy decisions are conceived.

  • Support for Our Allies.   Haiti has strategically important allies throughout the world.  We have heavily relied upon the support of the international community for aid and provision of social services.  In fact, foreign aid comprises 75% of our national budget.  Where our interests align, we must actively support and engage our allies positioning Haiti as a trusted ally and champion of freedom.  In support of this principle, our Defense Force should seek to build strategic partnerships with our allies seeking support for the relaunch of our defense capabilities and ensuring that all allies understand the purpose for the new force.

Current Threats

Haiti has limited international threats given its weakened economic position globally.  The threat of international invasion is low.  Haiti lacks resources or strategic positioning to be a primary global target for invasion and has solid international relationships to protect against that threat.  Rather, threats to Haiti are primarily criminal and environmental.   

  • Drug Trafficking:  Our primary threat is drug trafficking.  According to recent reports, approximately 78% of the cocaine entering Haiti in transit to the United States is coming from Venezuela and the rest from Colombia. Drug trafficking is destabilizing for a country that is trying to build its democratic institutions. Under the Aristide regime Lavalas party members, the head of the President security, the Lavalas President of the Senate, several of Aristide’s police chiefs and his associate kingpin Jacques Beaudouin Ketant are all heavily involved in the drug trade. The marijuana traffic between Haiti and Jamaica is bringing arms in the country as well. As a result of these illegal activities and economic power, drug dealers have penetrated the banking system and various areas of the economy thus influencing elections, the justice system, the police, parliament and the executive branches.

  • Political Gangs:  They are again organizing to promote political chaos and undermine this Administration.  Under a group called the Ghetto Reunis former kidnappers and political gangs are planning disorder. They have burned several public markets (Tabarre, Croix des Missions and Gonaives) and two camps in order to push merchants who lost their goods to protest in the streets. They are working to create a destabilizing political campaign of violence against the population in an attempt to intimidate the Administration and undermine reform.

  • The former Haitian Military:  Illegally disbanded in 1995 by former President Aristide, the force remained a legal institution according to our constitution. During his campaign, candidate Martelly promised to build a modern army capable of answering to the needs of the country.  Recent polls showed that 98% of Haitian supports the build up of a Haitian Defense Force.  On November 18, 2011, President Martelly announced that the army would be reconstituted. Since then, some members of the former military have entered various bases asking the President to keep his promise and requesting overdue salaries and benefits. However, cabinet members have deemed their actions to be illegal.  While the Martelly administration is trying to peacefully resolve this issue the Minister of Defense has yet to issue a policy on how the Defense Force will be built and if some of the former military -- after proper vetting and evaluation -- will be integrated into the new force. 

  • Natural Disasters:  Haiti’s most destabilizing security threat comes from its geographical location.  Located on three earthquake fault lines and in a hurricane corridor, Haiti must be prepared to cope with natural disasters and emergencies.
    •    Viruses and Bacteria:  Viruses and bacteria are major threats to Haitian agriculture and therefore the economy and political infrastructure.  In a country with no healthcare infrastructure and subsistence farming, Haiti is particularly vulnerable to viruses and bacteria that can devastate the people and the economy furthering our dependence on international assistance and predatory foreign profiteers.  Often, foreign profiteers will increase the price of food to levels that become unaffordable for Haitians, who will take to the streets in protest resulting in an unstable political situation. 

In 2007, the avian flu virus killed 65% of Haiti’s chicken production with a direct impact on both the chicken and egg markets, two products consumed heavily by Haitians. For the past nine years three different viruses are killing banana trees, coconut trees and coffee. These have a huge economic impact on the famers, the agriculture and the economy of the country.  Haiti is forced to import these agricultural products, chicken and eggs from the Dominican Republic furthering our dependence on that country. 

The Nepalese soldiers of the United Nations Mission in Haiti (MINUSTAH) introduced a devastating cholera outbreak to the country by contaminating the main rivers of Haiti (Riviere de Mirebalais and the Artibonite River) with the cholera bacteria. That bacterium killed 100,000 people and infected thousands of Haitians. It is estimated that it will cost $1.5 billion to cure the people infected and clean the country from that bacteria.  Clearly Haiti does not have the financial resources to do that further putting the country in a weakened position.

While these are our primary immediate security threats, we do have international threats that merit close and careful monitoring as well as bilateral or multilateral collaboration.

  • Dominican Republic:  While relations are the most stable they have been in decades, there are many imbalances that need to be addressed comprehensively.  From a security standpoint, the Dominican military has been acting aggressively at our borders, violating Haitian human rights and, in some cases, crossing the border illegally.  They have also been strengthening their military building up a capability that far surpasses our own.  It is clear that they constitute a military threat – although not imminent – given the dramatic imbalance.  The perception in Haiti is that there is a sector of the international community that is supporting that hegemonic policy of the DR toward the first black republic of the world. This sector is working hard to sneak in Dominican soldiers and policemen into MINUSTAH. That would be unacceptable for 100% of the Haitian people. Launching our own Defense Force will contribute to rebalancing the relationship and addressing this national security shortcoming.

  • MINUSTAH:  The UN has a vested interest in maintaining the MINUSTAH force:  it is a source of extensive funding.  The 2010 budget for MINUSTAH was $864 million.  They have been largely ineffective in their mandate to professionalize the police and have been an outright threat in many instances to the Haitian people.

  • Foreign Profiteers:  There is a network of foreign profiteers operating in Haiti in alliance with the Groupe de Bourdon, Haiti’s corrupt business cartel supported by Lavalas anarchists which has become the most politically and economically destabilizing force in Haiti.  This network of profiteers is comprised of foreign politicians, NGO representatives, government officials and business representatives all seeking to cash in on Haiti’s aid.  They secure the aid money and contracts with a generous cut for their operating expenses and deliver no results for the people.  Less then one cent from every dollar actually goes to the Haitian government and there is almost no consultation with the Haitian government on how the money is spent.  In fact, the Haitian government has been unable to obtain basic information about how much aid money has been spent on what programs and how those programs and providers were selected.  They have now set their sites on the recently discovered USD$30 billion gold mines as well as the potential oil reservoir of Haiti. This is basic information.  Those who raise questions about the money and where it went have been politically and personally threatened, myself included.  

A New Framework  

In order to effectively meet these challenges, the Haitian defense team should be reorganized into six discreet organizations with clear lines of responsibility.

  • National Security Council
The National Security Council should be housed in the Office of the President as the primary advisory panel to the President on all domestic and international security issues.  The President will be the Chairman of the Council with the Prime Minister and Minister of Defense as Vice Chairmen.  In addition, Council members will include a representative from each of the following organizations: Ministries of the Interior, Justice, Foreign Affairs and the Haitian National Police, Territorial Defense Force, and the Intelligence Service.

  • Haitian National Police
The HNP will continue to serve as our primary domestic security force. The HNP is comprised of 14,000 police officers poorly trained and equipped and does not cover Haiti’s 140 municipalities. They should be professionalized, depoliticized and properly equipped. 


  • Territorial Defense Force of Haiti
Under the Ministry of Defense, the Territorial Defense Force of Haiti (TDFH) should be launched on November 18, 2012, Bataille de Vertieres holiday.  The new force should be comprised of 3,500 troops to be trained as a modern military protection force.  The primary role of the Force should be:
  • Protect and defend the nation’s borders;
  • Combat drug trafficking; and
  • Provide emergency and disaster response and management.

Proven perpetrators of atrocities and human rights violations under the former army will not be admitted.  Anyone found of illegal actions will not receive back salaries or pensions.  

  • TDFH Corps of Engineers
Haiti should establish a public engineering, design and construction management agency.  The Corps’ mission should be to provide public engineering services in peace and war to strengthen the nation's security, promote economic development, provide vital public works projects for social advancement, protect the environment and ecosystem of the country, and reduce risks from disasters.  

To that end, the Corps’ mandate should be:

  • Plan, design, build, and operate dams, bridges and irrigation systems. Other civil engineering projects will include flood control, beach nourishment, and dredging for waterway navigation.
  • Design and construct flood protection systems.
  • Design and construct defense facilities for the Territorial Defense Force, Intelligence Services, x, and the Haitian National Police.  
  • Develop and implement environmental and ecosystem restoration projects.

  • Ministere de l’Interieur et de la Protection Civile
Haiti lies on three known earthquake fault lines and in a major hurricane corridor.  In October 7, 2002, the Bureau of Mines issued a report to the Aristide Administration stating with certainty that Haiti would face an earthquake in the near future.  Nothing was done to address that risk.  In 2008, Haiti faced a devastating hurricane season.  Nothing was done to prepare and plan for that weather system.  In 2010, Haiti faced the most serious earthquake in its history resulting in one of the most serious humanitarian crises of the decade.  Our government was completely unable to respond to or manage that crisis calling in foreign militaries and agencies to stabilize our country and pick up the pieces.

Haiti must revamp and professionalize its emergency management and disaster response capabilities.  The primary purpose of Secretariat d’Etat de la Protection Civile within the Ministry of the Interior is to coordinate the response to a disaster that overwhelms the resources of local and departmental authorities.  The delegue of the department in which the disaster occurs must declare a state of emergency and formally request from the president that Secretariat d’Etat de la Protection Civile and the government respond to the disaster. 

Response capabilities should be divided into five categories:

  • Disaster Medical Assistance Teams:  This group should be comprised of doctors, nurses, paramedics, veterinarians, pharmacists, morticians, and forensic scientists to provide medical care at disaster scenes.  

  • Disaster Medical Systems:  This group should be comprised of hospital administrators, pharmacists and representatives of the Ministry of Health to mobilize resources in disasters.

  • Epidemic and Pandemic Disease Containment:  This group should be comprised of epidemiologists, doctors, hospital administrators, pharmacists, and representatives of the Ministry of Health to contain and treat the outbreak of communicable diseases.  This group could also contain an international outreach and coordination team that will work with counterparts around the world to contain disease outbreak.

  • Search and Rescue Team:  Search and rescue teams should be comprised of police and defense force personnel to rescue victims from structural collapses, confined spaces, and other disasters.  This team should also build international support networks.

  • Mobile Emergency Response Support (MERS):  The vehicle provides communications support after a major hurricane.  These teams provide communications support to local public safety. For instance, they may operate a truck with satellite uplink, computers, telephone and power generation at a staging area near a disaster so that the responders can communicate with the outside world. There are also Mobile Air Transportable Telecommunications System (MATTS) assets, which can be airlifted in. Also portable cell phone towers can be erected to allow local responders to access telephone systems.  

  • Intelligence Service
The primary purpose of the nation’s intelligence service should be to gather information relating to domestic and international security threats to Haiti to inform policy makers on critical domestic and foreign policy issues.

Parliament will have to pass legislation to provide for the national security of the country and ensure this strategy becomes real.  In addition, parliament should pass legislation to guarantee that resources from private donations to NGOs, international aid and cooperation, private investments and the exploitation of Haiti’s gold and diamond mines as well as oil benefit both investors and the Haitian people.

The International Community

Haiti will need a cohesive and comprehensive strategy to secure the necessary international support for this initiative.  

  • Ensure Support From the TDFH from Traditional Allies:  Haiti needs to define the establishment of the force as part of an overall defense strategy and an effort to reclaim sovereignty and build internal capacity.  There are several international allies that will be willing to help and support this domestic goal.

  • Renegotiate UN Framework:  MINUSTAH is spending around $864 million yearly in Haiti without having a net positive impact on the country. The mandate of the mission should be refocused to an exit strategy to allow serious security institutional building to strengthen Haitian security capabilities like what happened with the U.S. military in Iraq to facilitate an organized and orderly departure of MINUSTAH.

  • Effectively Convey Haiti’s Rationale.  A network of political opponents has already begun a public relations campaign, particularly in the U.S., to undermine the establishment of the TDFH.  They have a well-worn and very weak argument.  Haiti’s rationale for relaunching the force is eminently defensible with the facts, but a well-funded and savvy team of lobbyists is undermining those facts.  The Haitian government needs to clearly convey its rationale.

The Rationale

Getting lost in the overall debate is the Haitian Government’s rationale for launching such a defense force.  Therefore, I would like to provide a simple, concise outline of why the establishment of the defense force is actually a top priority for Haiti:

  • This is the will of the Haitian people:  On the campaign trail, citizens raised the issue of the Defense Force repeatedly with President Martelly, which prompted him to include it in his platform.  The launch of this Force is a direct response to the request and will of the Haitian people who have been far too long marginalized from the political process.  Currently, more than 96% of the people support the idea. 

  • The MINUSTAH has failed to produce results and has become a destabilizing force:  Over the past seven years, the MINUSTAH has received more than $3.5 billion in funding.  We can hardly see any of the lasting impact or results of that investment.  MINUSTAH’s track record has been plagued by scandal after scandal.  There was a sex scandal involving Uruguayan and Nepalese soldiers; their responsibility for introducing cholera into the country after the earthquake resulting in the deaths of 10,000 Haitians and 500,000 illnesses; involvement in a murder; business scandals and corruption; and most recently, the rape of a 17 year old man caught on video tape for which the offenders were not immediately punished but only extradited to their home country.  They have become a destabilizing force and there is growing fear amongst the Haitian population.

  • Actions of the military under previous dictatorships should be factored into the launch of a new force, but are not a reason to undermine the establishment of a modern protection force in Haiti:  Many people are arguing that Haiti’s previous dictatorships politicized the army and it became an uncontrollable and corrupt force. There were actually many reasons for the disbanding of the military in 1994 by Aristide, and many in fact were more political than security related. But Haiti has not fared well in the absence of a military either.  Gangs proliferated and drug trafficking burgeoned. We should also remember that Haiti’s military history is not all bad.  There are few militaries in the world that have a spotless record.  But Haiti’s military has some remarkable triumphs as well.  Overthrowing colonial forces being chief among them.  And, supporting other nation’s in their quest for freedom and liberty.  Haiti’s troops supported Bolivar in his quest to liberate Latin America.  Haiti’s troops fought alongside Americans in Savannah, Georgia in their quest for independence from colonial power.  We can hardly judge our military history based only on the tragic events under the Duvalier dictatorship.

  • In fact, the building and professionalization of an army in transition countries, is a standard practice – so why would there be a double standard in Haiti?  The US military strategy in Iraq and Afghanistan included building and training modern armies.  After the fall of Pinochet in Chile, they reformed their army, which has been a modern military force which most recently displayed their organization in their 2010 earthquake recovery efforts. Haiti is no less able to overcome a tragic historic episode and build a modern military than these nations and countless others throughout the world that have overcome their historic precedents.

  • The HNP is incapable of managing Haiti’s current threats:  Outgoing MINUSTAH commander, General Elito, said in 2005 year that even if Haiti were to train an addition 30.000 police officers, the HNP would be incapable of providing for the domestic security.  Further, a modern military provides services beyond policing.

  • Haiti was incapable of responding to a major natural disaster, a traditional role of the military throughout the world.  In the wake of the 2010 earthquake, we were unable to respond in any way to the disaster.  The US military had to come in and manage our ports and airports, conduct search and rescue missions, and provide air support for food delivery and immediate medical assistance.  This is not sustainable for a country that is located in a major hurricane corridor and lies on three earthquake fault lines.  We must have our own capabilities.  And, these capabilities throughout the world are performed by the military.

  • Launching our own defense force is more cost effective and can address some immediate employment challenges.  We would envision hiring and providing training to 3,500 young Haitians.  Unemployment in our country among youth is 70%.  This is also an effective and immediate jobs program. Further, the international community (tax payer dollars) pays almost a billion dollars annually to support the UN defense force.  We estimate that the train and run our army, we will need a $200 million budget.

  • Most importantly, we are a sovereign and free country.  Why wouldn’t we have our own protection forces?  Why wouldn’t Haiti have the right to defend its borders?  There is no defensible reason to justify denying Haiti the right to defend itself and exercise its sovereignty.

Tuesday, October 2, 2012

AMIDST RISING FOOD PRICES AND MORE STARVATION IN HAITI USAID REMAINS OFF TRACK

70 percent of the funds given to the two largest U.S. contractors for a cash for work project in Haiti was spent on equipment and materials. As a result, just 8,000 Haitians a day were being hired by June, instead of the planned 25,000 a day, according to the IG.

OFFICE OF INSPECTOR GENERAL


AUDIT OF USAID’S HAITI RECOVERY INITIATIVE ACTIVITIES MANAGED BY OFFICE OF TRANSITION INITIATIVES



AUDIT REPORT NO. 1-521-12-009-P  SEPTEMBER 26, 2012 


SUMMARY OF RESULTS 
In January 2010 Haiti was struck by a devastating earthquake that leveled extensive portions of Port-au-Prince, killing or displacing hundreds of thousands of people.  According to USAID’s Office of Transition Initiatives (OTI), the Haitian Government was largely incapacitated because significant numbers of government officials were killed and many buildings and records were destroyed. 

In the immediate aftermath of the earthquake,  OTI began implementing the Haiti Recovery Initiative (HRI). The initial focus was on supporting short- and medium-term activities aimed at stabilizing the Caribbean nation through assistance  with community revitalization, improved governance, and economic strengthening. 

In March 2011 OTI awarded Chemonics International Inc. a $53-million, 18-month contract to continue its work under the second phase of HRI (called HRI-II).  HRI-II was designed to support the January 2011 Post-Earthquake U.S. Government Haiti Strategy; according to that, the United States would help Haiti strengthen its economy and public institutions in the three strategic development corridors of Port-au-Prince, Saint-Marc, and Cap-Haitien.  As of May 3, 2012, OTI obligated $46.5 million and disbursed $23 million. 

The Regional Inspector General/San Salvador (RIG/San Salvador) conducted this audit to determine whether HRI-II activities are achieving their main goals of stabilizing Haiti through community revitalization, increased citizen engagement, and improved governance. 

The audit found that many OTI activities are providing benefits, such as: 
 OTI worked with the International Organization for Migration to relocate about 1,250 internally displaced families that were living in two camps in Petionville.  The camps were cleared in December 2011. 
 OTI provided the Haitian Parliament with temporary offices and meeting space. Parliament’s headquarters partially collapsed during the earthquake.  However, while individual activities had positive impacts locally, OTI was not using a structured system for measuring and reporting whether HRI-II as a whole was meeting its broader national objectives, and the lack of such a system made it difficult to measure the program’s impact.   


Furthermore, HRI-II was not on track to complete all activities before the scheduled end date of September 2012.  Budget line items in the contract provided for grants under contract ($37.3 million) and “non-grant under contract” activities, such as direct procurement of goods and services ($3.3 million) for a total of $40.6 million.  As of February 2012, 141 activities worth about $22.9 million had been developed and approved, leaving $17.7 million available for new activities to be approved, implemented, completed, and closed in the 7 months left.   

The audit also found some additional areas in which program management could be improved 
as discussed in the following findings. 
 The monitoring and evaluation system was weak (page 3). 
        Community involvement in activities was not sufficient (page 7). 

 A short-term technical assistance activity did not meet expectations (page 7). 
        An environmental review for an activity was not performed and approved before 
implementation (page 7). 

This report recommends that OTI: 
1.  Implement a plan to measure and report progress toward meeting HRI-II’s goals for the remainder of the program (page 5). 
2. Update its  implementation plan for the remainder of the program to include estimated timelines for each phase of an activity for development, implementation, and closeout 
(page 5). 
3.  Work with USAID/Haiti to conduct and document data quality assessments for the indicators OTI reports on for the mission’s operational plan and performance report (page 5). 
4.  Incorporate plans to engage communities when developing activities so the communities will sustain the efforts (page 6). 
5.  Implement communications plans into ongoing and new activities to make the local population aware of the activity and its benefits for the community (page 6). 
6.  Implement processes to assess short-term technical assistance with grantees throughout the grant cycle (page 7). 
7.  Review the existing environmental documentation of current and planned activities for compliance with environmental review requirements (page 9). 

8.  Require Chemonics to confirm that environmental reviews are completed before any activities begin (page 9). 

Detailed findings appear in the following section.  The audit scope and methodology are 
described in Appendix I. Management comments are included in their entirety in Appendix II, and our evaluation of management comments is included on page 10 of the report. 


AUDIT FINDINGS 
Monitoring and Evaluation System Was Weak 
USAID’s Automated Directives System (ADS) 200.6 defines performance management as the systematic process of monitoring the achievements of program operations; collecting and analyzing performance information to track progress toward goals; and using that information to influence how decisions are made and how resources are allocated.  According to ADS 203.3.3.1, the performance management process has four principal steps: (1) establishing a performance management framework, (2) collecting and analyzing performance information, (3) using that information to influence decision-making and resource allocation throughout a program, and (4) communicating results. Missions use performance management plans as tools to plan and manage the process of monitoring, evaluating, and reporting progress toward achieving objectives.  ADS does not provide a format for performance management plans; USAID offices and missions are allowed to use the format that best fits their needs. 

OTI’s contract with Chemonics states, “Timely evaluation of activities and the program more broadly is a critical component of ongoing, updated analysis, which is accomplished through periodic strategic review sessions for regular evaluation of recent activities and the program.” Because OTI communicates frequently with its partners, it can adjust activities as needed throughout the course of a program.  However, in the case of HRI-II, the lack of management tools to measure progress toward program goals made it difficult to measure the program’s impact. Specific monitoring and evaluation concerns are discussed below. 


Program Management Was Not Comprehensive.   HRI-II’s monitoring and evaluation focused primarily on the activity level and to a lesser extent on the program as a whole.  Each activity had three levels of objectives and indicators to measure outputs, outcomes, and impact.  HRI-II developed two guides, Activity Cycle and Guidebook and Activity Management Guide, to help employees manage the program. However, while the guides provided templates and addressed procedures for awarding and administering grants for the program, they did not contribute to monitoring the entire program. 

According to the HRI-II contract, program monitoring efforts should include regular evaluations of the program, as well as the activities.  These evaluations should allow the HRI-II staff to refine the program’s focus. The contract further states that the participants, nature, structure, and frequency of the evaluations depend on the country context, program needs, and the staff. In general, they should be conducted between two and four times a year.  

OTI has conducted only one evaluation for HRI-II so far, and it took place in June 2011 to discuss and draft OTI’s strategy for Haiti, to build the new HRI-II team, and to propose ideas of where to conduct activities.  OTI officials said they conduct quarterly “rolling assessments” to assess programmatic issues, program development, and implementation.  In addition, OTI and Chemonics met weekly to cover program development and implementation, and to discuss problems, delays, and challenges.


While these meetings contribute to program development and implementation, they do not measure progress toward ultimate program goals. HRI-II Did Not Have Program-Wide Monitoring and Evaluation Plan.  When the program started in March 2011, the staff developed a monitoring and evaluation guide that consisted of guidelines and procedures for developing monitoring and evaluation plans.  However, it did not constitute a formal plan that HRI-II’s staff could use to track progress, nor did it explain how results would be measured and documented throughout the program.   

Chemonics officials said they decided not to prepare a formal plan because the activities were so different from each other that monitoring and evaluation plans needed to be tailored to the activity level. At the time of the audit, HRI-II had 141 activities in progress.  Because each activity had its own individual monitoring and evaluation plan, Chemonics was tracking 141 different plans, but had no single plan for the entire program.  After an activity was completed, the Chemonics staff performed a final evaluation.  OTI and Chemonics officials said they would use final evaluations, comparisons of “clusters” of similar activities, and “thematic reviews to provide lessons learned and a feedback loop” to guide future activities. However, given HRI-II’s short time frame and the different nature of the activities, this approach might not provide useful or timely information as a monitoring and evaluation tool. 

Poorly Defined Indicators.   USAID guidance states that performance indicators should be unambiguous about what is being measured and closely track the results they are intended to measure. 

Some of the performance indicators Chemonics developed were not well-defined.  One activity provided computer equipment, chalkboards, benches, chairs, desks, and school kits consisting of backpacks and school supplies to two public schools in target communities.  Yet a performance indicator for that activity measured the number of students who returned to school. OTI developed the activity to help offset some of the costs borne by the parents in sending their children to school, but the performance measure did not correlate to the activity.  


Other activities reviewed had only one or two indicators, and they were poorly defined; for example, one purportedly measured  Number of government institutions supporting a conflict and/or fragility. An activity that provided a local  municipality with an engineering study for improving one of the town’s main roads was measured by  Number of reconstructed national governing institutions and systems that receive USG  [U.S. Government] assistance to incorporate principles that support democracy and government legitimacy. None of these activities had indicators that clearly measured objectives.  

Implementation Plans Lacked Timelines.  OTI requires Chemonics to track activity data through OTI’s activity database, which includes a field for a detailed implementation plan.   In addition, an activity or grant notes field provides chronological updates of the activity’s progress or anything discussed in implementation meetings.  The combined information in the two fields helps OTI track an activity’s progress.  

However, the detailed implementation plans for some of the activities reviewed did not have enough information for OTI to see whether the activity was on track to end on time and to meet its objectives.  For example, the plan for providing Haiti’s Parliament with temporary offices and meeting space consisted of “The subcontractor will be responsible for the following: 


1) Assembling and installation of steel-framed structures; 2) Connection of utilities.”  No dates or estimated timelines were included. 

Data Quality Assessments Not Performed. ADS 203.3.7.3 states that performance data reported to USAID/Washington in the performance plan and report must have had a data quality assessment (DQA) completed within the past 3 years. The goal of a DQA is to inform managers of data strengths and weaknesses and the extent to which data can be relied upon to influence management decisions.  

Although results of OTI’s HRI-II activities were reported in USAID/Haiti’s fiscal year 2011 performance plan and report, the staff did not conduct DQAs of the data for the five indicators that it reported on in 2011.   

All of the problems discussed in this finding stemmed from the fact that OTI did not make monitoring and evaluation a priority early in the HRI-II’s implementation.  OTI officials said it started becoming a priority when Chemonics hired a full-time monitoring and evaluation officer in August 2011.   

According to an OTI management review completed in January 2011, the HRI I program did not place enough emphasis on monitoring and evaluation.  The team conducting the review recommended that OTI hire a permanent staff member to oversee monitoring and evaluation. OTI advertised for a foreign service national monitoring and evaluation specialist in April 2011, but officials said they did not receive any qualified applicants. 

Under the program’s monitoring and evaluation framework, it was hard to consistently and effectively evaluate how results and targets were measured.  This handicap could result in activity objectives not being met.  To strengthen the program’s monitoring and evaluation system, we make the following recommendations


Recommendation 1. We recommend that USAID/Office of Transition Initiatives implement a plan to measure and report progress made toward achieving program goals for the remainder of the program. 

Recommendation 2.  We recommend that USAID/Office of Transition Initiatives require Chemonics International to update its  implementation plans for the remainder of the program to include estimated timelines for each phase of an activity for development, implementation, and closeout. 

Recommendation 3.  We recommend that USAID/Office of Transition Initiatives 
coordinate with USAID/Haiti to conduct and document results of data quality assessments for the indicators that USAID’s Office of Transition Initiatives reports on for the mission’s operational plan and performance report. 

Communities Were Not Involved 
Enough in Activities 
As described in USAID’s sustainable development strategy, “Sustainable development mandates participation. It must involve, respond to, and be accountable to the people who will live with the results of the development effort.”  According to the HRI-II contract, the goal of USAID/OTI’s efforts in Haiti is to help stabilize the country while laying the foundation for development and good governance.  The contract further states that OTI would pursue all programming with an eye to community participation, government engagement, and alignment with the unified U.S. Government approach in Haiti. 









HRI-II’s offices in Port-au-Prince, Cap-Haitien, and Saint-Marc have worked with local communities to develop activities tailored to meet their needs.  Nonetheless, not all of the activities implemented in the corridor around Cap-Haitien were developed by the regional office that understood the social and economic context of the area, and not all activities implemented have involved community participation in a way that guarantees sustainability.  OTI’s 2012 Management Review pointed out that the leadership of the Chemonics office in Port-auPrince often failed to communicate to the Cap-Haitien team the information necessary to conduct activities there that were developed or managed by the Port-au-Prince office.  Program  officials expressed concerns regarding activities planned by the Port-au-Prince office that did not utilize local knowledge.  In addition, they said Chemonics used contractors from Port-auPrince to implement a number of activities in Cap-Haitien and Saint-Marc; these contractors brought their own people to do the jobs instead of hiring locals.  As a result, residents saw jobs in their neighborhoods being done by outsiders, and without an understanding of the activities, they did not see how anyone local benefitted. 

Program officials said that for some activities, particularly in the Cap-Haitien corridor, community members did not feel engaged and did not take ownership of the completed projects.  Urban beautification projects in the towns of Limonade and Caracol failed for these reasons.  The purpose of these projects was to improve public areas by installing plants and benches, as well as doing minor masonry work, and to project “a positive image of what role the nearby Caracol industrial park and other upcoming economic investments will play in citizens’ lives.” The landscaping work in Limonade was not completed as planned because of a lack of coordination between two HRI-II activities.  Chemonics purchased and planted some seedlings for the town center, but they died from lack of care.  According to the project’s final evaluation report, residents did not understand how the activity led to the beautification of the area nor did they associate it with the industrial park.  Limonade’s mayor said the municipality could have been involved more in planning the activity to ensure its success.   


Although many of OTI’s activities included  community collaboration in development and implementation, some did not, and they were not very successful because OTI did not always incorporate plans into activity designs to  promote community ownership and sustainability. Furthermore, OTI did not require Chemonics to implement a communication plan for each activity to increase the local population’s awareness of it and its benefits to the community. While OTI must strike a balance between coordinating closely with local communities and meeting its mandate of being fast and flexible, activities implemented with limited participation from local communities can hurt the prospects for sustainability.  Therefore, we make the following recommendations. 

Recommendation 4.  We recommend that USAID/Office of Transition Initiatives incorporate plans to engage communities when developing activities so that they will take ownership and sustain the efforts. 

Recommendation 5. We recommend that USAID/Office of Transition Initiatives require 
Chemonics International to implement communications plans for ongoing and new activities to increase the local population’s awareness of the activities and how they will benefit the community. 

Short-term Technical Assistance 
Activity Did Not Meet Expectations 
The audit team reviewed one of nine ongoing short-term technical assistance activities.  These 
provide an organization with an expert who trains or mentors employees for a short period of time. The HRI-II activity provided Haiti’s national mapping agency, Centre National de l’Information Geo Spatiale (CNIGS) with a geographic information system (GIS) specialist for 6 months because the agency lost most of its management staff, facilities, and equipment during the earthquake. The consultant was responsible for helping transfer mapping information from international humanitarian agencies to CNIGS and for working with other donor agencies in developing an information system for coordinating housing and neighborhood reconstruction. According to CNIGS and the consultant, the information system was not finished when her contract ended in February 2012.  CNIGS’s acting director said she did not provide the help the agency needed and her input did not meet its needs. The acting director added that the consultant’s efforts to document user requirements for the information system were insufficient and would have to be redone by the system developer. The consultant said she had difficulties getting CNIGS staff members to discuss data sharing agreements, which delayed establishing the data-sharing protocols. In addition, the tasks of implementing the conceptual model of the information system and configuring the GIS server were only halfway completed by the end of her contract.  

The activity did not meet its objectives because Chemonics did not communicate effectively with CNIGs or provide adequate support to the consultant.  In October 2011, shortly after the consultant began working at the agency, she told Chemonics officials she was having difficulties discussing with CNIGS what they expected her to do in developing the system.  Chemonics officials told her to continue to try to work with the agency. 


Chemonics officials said they had separate meetings with the consultant and CNIGS monthly, but they focused on program development.  The  Chemonics officials said they never asked agency staff members whether the consultant was meeting their needs and learned only at the activity’s end that CNIGS was not satisfied with her. Short-term technical assistance might not help grantees if they do not get the type of assistance they need or if they do not use the expertise provided appropriately.  To assist OTI in managing current and future short-term technical assistance grants, we make the following recommendation. 

Recommendation 6.  We recommend that USAID/Office of Transition Initiatives implement processes to assess short-term technical assistance with grantees periodically throughout the grant cycle. 


Environmental Review Not Performed and Approved Before Implementation 
ADS Chapter 204, “Environmental Procedures,” states that USAID must fully comply with environmental procedures established in the Code of Federal Regulations (22 CFR 216). USAID is required to “integrate environmental issues into its programs, both to meet U.S. Government legal environmental obligations and to optimize economic and social development results.” 

Supplementary guidance to ADS 204 provides descriptions of environmental procedures to include in requests for proposals and award documents.  The purpose is to give USAID time to conduct environmental reviews and incorporate environmental factors and mitigating measures in the design and approval of each program and activity before making an irreversible commitment of resources.  ADS further states that the review should be done as early as possible in the design process to allow enough time for more detailed subsequent environmental review and concurrence, and for integrating environmental mitigations into the process. 

Chemonics has established procedures for environmental reviews to screen each activity for potential adverse impacts, recommend determinations to categorize environmental risk, and identify mitigation and monitoring measures.  The procedures for mitigation and monitoring include templates for environmental mitigation plans and reports; these were developed for USAID/Haiti to use when implementing infrastructure and related activities.  Several of the activities the team reviewed were designated as “negative with conditions,” which applies to activities that could have moderate adverse environmental impacts, but could be managed effectively with appropriate mitigation and monitoring measures.  For these activities, Chemonics used plans that included mitigation measures and reporting on monitoring of those measures.


In one of the activities, OTI did not complete the required environmental review and mitigation and monitoring plan before implementing the activity, which was designed in June 2011 to generate temporary employment opportunities through planting 700,000 jatropha seedlings in the Saint-Marc corridor.  In Chemonics’s environmental review of the activity, it recommended a determination of “negative with conditions,” requiring an environmental mitigation and monitoring plan. 

However, although the seedlings were planted in August 2011, OTI had not approved the environmental determination, and the mitigation and monitoring plan was not in effect.  The environmental officer visited the jatropha plantation in August 2011 and said that no negative effects had occurred; the officer said Chemonics had done scientific research to be sure that the type of jatropha was proper for the area, but had not yet documented the environmental work performed. Subsequently, Chemonics developed a mitigation and monitoring plan and submitted it to USAID/Haiti and OTI for approval. The mission environmental officer and contracting officer’s representative approved the environmental mitigation plan and report in October and November 2011, respectively—after the jatropha had already been planted. 


The lack of planning for environmental mitigations before implementation happened because OTI and Chemonics neglected to be sure that they complied with the requirements to complete the environmental documentation and to obtain the necessary USAID approvals before planting the trees. Potentially adverse environmental impacts can occur if proper mitigation and monitoring procedures are not put into place before implementing an activity and monitoring it. Therefore, we make the following recommendations. 

Recommendation 7. We recommend that USAID/Office of Transition Initiatives review the existing environmental documentation of current and planned activities for compliance with environmental review requirements, and document the results of the review. 


Recommendation 8. We recommend that USAID/Office of Transition Initiatives require Chemonics to complete environmental reviews before implementing activities. 


EVALUATION OF MANAGEMENT 
COMMENTS 
Based on our evaluation of management comments on our draft report, we have determined that management decisions have been reached on all recommendations.  In addition, final action has been taken on Recommendations 2, 4, 5, 6, 7, and 8.  Our detailed evaluation of management comments follows. 

Recommendation 1.  OTI agreed to implement a plan to measure and report progress toward meeting program goals for the remainder of HRI-II.  Officials said they would hire a local contractor to conduct third-party monitoring and evaluation. In addition, OTI plans to require the monitoring and evaluation contractor to develop indicators to be used for measuring and reporting on goals for the remainder of the program.  OTI expects to have this in place by December 31, 2012. Based on OTI’s planned actions and estimated time frames, a management decision has been reached on this recommendation. 

Recommendation 2.  OTI agreed to update its implementation plan for the remainder of the program to include estimated timelines for each phase of an activity for development, implementation, and closeout.  In May 2012 OTI updated its procedures and required Chemonics to submit detailed implementation plans that include timelines for estimated completion of each phase of an activity.  Based on OTI’s response and supporting documents provided, final action has been taken on this recommendation.   

Recommendation 3.  OTI agreed to conduct and document DQAs of the indicators OTI reports on for the mission’s operational plan and performance report.  In management comments, OTI officials said they would work with USAID/Haiti’s Program Office on the DQAs, and they expect to complete them by December 1, 2012.  Based on OTI’s response and estimated time frames to complete the DQAs, a management decision has been reached on this recommendation. 

Recommendations 4 and 5.  To address the recommendations, OTI issued updated guidance to Chemonics in August 2012 that required it to incorporate community engagement and communication into each activity’s implementation plan.  The plans should include information about how and when Chemonics plans to engage the communities in an activity and what communication tools it plans to use to increase activity impact by highlighting participation of local authorities and explaining the benefits to the community.  OTI provided a copy of the updated guidance explicitly stating that community engagement is to be conducted in the activity development stage to promote community ownership and sustainability for all community stabilization activities. As a result of OTI’s response and completed actions, final action has been taken on these recommendations. 

Recommendation 6.  OTI agreed to implement processes to assess short-term technical assistance with grantees throughout the grant cycle.  In response, OTI has implemented a procedure to include meetings with grantees as a monitoring and evaluation requirement for its short-term technical assistance activities.  OTI provided copies of the updated monitoring and evaluation guidance issued to Chemonics that includes the new requirement.  Based on OTI’s response and documented actions, final action has been taken on this recommendation. 





Recommendations 7 and 8.  OTI agreed to review the existing environmental documentation of current and planned activities for compliance with environmental review requirements, and to require Chemonics to confirm that environmental reviews are completed before any activities begin. OTI conducted a review of current and planned activities for environmental compliance. It also worked with USAID environmental officials to develop umbrella mitigation and monitoring plans for infrastructure, water and sanitation, and watershed activities.  In addition, OTI added a step in its approval process to document environmental compliance requirements that must be completed before an activity can be approved.  OTI provided documentation of the new requirement and a checklist documenting its environmental compliance review of the ongoing and planned activities.  OTI also provided copies of the umbrella environmental mitigation and monitoring plans. Based on the actions taken by OTI and supporting documents, final action has been taken on these recommendations. 


SCOPE AND METHODOLOGY 
Scope 
RIG/San Salvador conducted this performance audit in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions in accordance with our audit objective.  We believe that the evidence obtained provides that reasonable basis.  The purpose of the audit was to determine whether OTI is achieving its main goals of stabilizing Haiti through support for community revitalization, increased citizen engagement, and improved governance. 

OTI awarded a cost-plus-fixed-fee completion form task order to Chemonics on March 14, 2011, to provide short-term technical assistance to reinforce stability and lay the groundwork for longer-term development in Haiti.  As of May 3, 2012, OTI had obligated $46.5 million and disbursed $23 million. As of February 10, 2012, OTI had approved activities worth $22.9 million. 

The audit was performed at USAID/Haiti and at the Chemonics project offices in Port-au-Prince, Cap-Haitien, and Saint-Marc from January 11 through April 11, 2012.  The audit reviewed a judgmental sample of 22 ongoing and completed activities valued at $6.8 million from a universe of 141 activities approved, in process, or completed as of February 2012, valued at $22.9 million.  The audit covered the period March 14, 2011, through February 10, 2012.  We visited 19 sites in Port-au-Prince, Cap-Haitien, and Saint-Marc. 


In planning and performing the audit, we assessed relevant internal controls that OTI used to manage its Haiti program. These controls included established policies and procedures for grant administration and program management,  monitoring and evaluation processes, and reporting processes. 

Methodology 
To answer the audit objective, we interviewed OTI and USAID/Haiti officials, Chemonics employees, grantees, and beneficiaries. We reviewed and analyzed relevant documents including activity plans, grant agreements, grant and procurement documentation, activity progress and final evaluation reports, and environmental reviews.  We judgmentally selected 22 ongoing and completed activities to obtain a sample of activities across regions, sectors, goals supported, and grantee type.  We compared expected results with actual results by reviewing supporting documentation, observing activity implementation on site visits, and interviewing grantees and beneficiaries.  Since the testing was based on a judgmental sample instead of a statistical one, the results and conclusions are limited to the items tested and could not be projected to the entire audit universe. To determine the reliability of computer-processed data in OTI’s activity database, for activities reviewed we compared grant data to source documents, and compared reported progress with conditions we observed during site visits. 

MANAGEMENT COMMENTS

August 22, 2012 
MEMORANDUM 
TO:  Regional Inspector General/San Salvador, Jon Chasson 
FROM:  USAID/DCHA/OTI Director, Robert Jenkins /s/ 
USAID/Haiti Acting Mission Director, Steve Olive /s/ 
SUBJECT:  USAID Response to Audit of USAID’s Haiti Recovery Initiative Managed by the Office of Transition Initiatives (Report No. 1-521-12-XXX-P) 

This memorandum transmits USAID’s response to the Regional Inspector General’s draft audit report “Audit of USAID’s Haiti Recovery Initiative Managed by the Office of Transition Initiatives,” dated July 26, 2012 for your consideration.   USAID’s Office of Transition Initiatives (USAID/OTI) programs are, by nature, challenging to evaluate because of the iterative process applied to project development that is designed to work in rapidly changing program environments such as Haiti.  We appreciate the efforts of the RIG staff to understand our unique programming approach and processes.   

Regarding Recommendation 1: We agree with this recommendation. USAID/OTI is 
currently in the process of engaging a local contractor to conduct third party monitoring and evaluation.  One of the first deliverables of the contract will be the development of indicators that will be used for measuring and reporting against achievement of program goals for the remainder of the program.  We will have these in place by December 31, 2012.  It should be noted that it is challenging to attribute direct results in complex and fluid stabilization environments, and it is often the absence of destabilizing events that demonstrates stability in these historically volatile areas. Barring sudden major destabilization in our target communities, we anticipate that the indicators will offer qualitative and quantitative impact data and will be based on plausible correlation which may not be directly attributable to individual activities.   



Regarding Recommendation 2: We agree with this recommendation. USAID/OTI 
revised the “Activity Cycle and Guidebook” on May 2, 2012 to include guidance for the contractor on improving the implementation plans for each grant.  The contractor will now submit basic implementation plans with the grant approval documentation and will submit detailed implementation plans with timelines for estimated completion of each portion of the activity no more than one week after the kick off meeting where the grantee signs the grant. 

Regarding Recommendation 3: We agree with this recommendation. USAID/OTI will 
work with the USAID/Haiti Program Office to complete the data quality assessments for the five indicators to which USAID/OTI contributes in the Mission’s Operation Plan and Performance Report. We will complete the data quality assessments no later than by December 1, 2012. 

Regarding Recommendation 4 and 5: We agree with this recommendation. 
Community engagement and ownership is a cornerstone of USAID/OTI programs worldwide and an integral part the USAID/OTI program, especially for our community stabilization activities.  This has been an important aspect of our approach since the inception of the program; however, USAID/OTI recognizes that it has not been adequately documented and has faced particular challenges in activities that are not developed at the community level but which were requested by the Haitian national government or other USG actors.  USAID/OTI revised the “Activity Cycle and Guidebook” on August 16, 2012, to specify that the contractor will include community engagement and communication as part of the implementation plans for community stabilization grants.  The development section of the “Activity Cycle and Guidebook” also now explicitly states that community engagement will be conducted at the development stage of the activity design process to promote community ownership and sustainability for all community stabilization activities. The implementation section of the “Activity Cycle and Guidebook” also now explicitly states that community engagement will be conducted at the development stage of the activity design process to promote community ownership and sustainability for all community stabilization activities. The implementation section of the “Activity Cycle and Guidebook” also now states that the contractor submit an activity note for community stabilization activities describing the communication plan to increase the local population’s awareness of the activity and how it will benefit the community.     

Regarding Recommendation 6: We agree with this recommendation. 
Following the site visit by the audit team where the unmet expectations were raised by the grantee, USAID/OTI discussed the situation with our contractor and immediately began including check-in meetings with the grantee on the M&E plan for Short-Term Technical Assistance (STTA) activities that were in development.  This included two with the same grantee of the audited activity, CNIGS.  It should be noted that although there were communication issues with this STTA, for the majority of our other STTA activities to GOH entities, they have asked to extend the consultants because of how much they value the consultants’ contributions to the organization.  USAID/OTI included grantee check-ins as an M&E requirement for STTA activities in the August 16, 2012 M&E guidebook. 

Regarding Recommendation 7: We agree with this recommendation.
The activities reviewed under this audit were developed prior to Chemonics’ conducting an environmental compliance training in September 2011 in which USAID’s Regional Environmental Officer (REO) and the Mission Environmental Officer (MEO) participated. USAID/OTI has already completed its review of environmental documentation for current and planned activities, and worked with the MEO and REO to create three Umbrella Environmental Mitigation Plans and Reports (UEMPRs) for infrastructure, water and sanitation, and watershed management and irrigation.  USAID/OTI creates individual EMPRs for all HRI activities that do not fall under one of the UEMPRs and now regularly reviews a spreadsheet that tracks the environmental compliance plans and regular reporting for all activities.   

Regarding Recommendation 8: We agree with this recommendation. 
On October 20, 2011, HRI added a section in the activity approval documents to document environmental compliance needs for each activity which must be completed before the activity is approved. In this section, the activity is classified based on its potential for environmental impact and what environmental documentation or mitigation works will be needed during implementation.  Corresponding guidance was added to the “Activity Cycle and Guidebook” on May 2, 2012.  Many of the common types of activities implemented by HRI that have potential for environmental impacts are implemented using an UEMPR. HRI’s efforts to improve environmental compliance 